Chapter 9
SEEKING PARTNERSHIPS
"The Park Service does its best to protect these
national treasures [national parks], but it needs the partnership of
local governments and local citizens, those who have the most at stake
to fully achieve this objective." National Park Service Director William
Penn Mott Jr. used his speech at the 125th anniversary ceremonies for
the First Battle of Manassas to remind his audience of park concerns. In
July 1986 Mott's words seemed especially pertinent to the Manassas
National Battlefield Park. Just a few months earlier, the Hazel/Peterson
Companies, a northern Virginia real estate development firm, had
announced its plans to build a corporate office park and residential
district, called the William Center, next to the battlefield park. The
way the National Park Service handled the ensuing situation reflected
Mott's call for partnerships. [1]

Fig. 12. Amidst musket firing demonstrations and period
dress displays commemorating the 125th anniversary of the First Battle
of Manassas, National Park Service Director William Penn Mott Jr.
reminded attendees of present-day concerns when he called for the
National Park Service to develop partnerships with local governments and
local citizens to protect such national treasures as Manassas National
Battlefield Park from outside development. (Photo by John
McDonnell. © 1988, The Washington Post. Reprinted with
permission)
|
Seeking partnerships outside the park was not
entirely new for superintendents at the Manassas National Battlefield
Park. Joseph Mills Hanson and James Myers had been active in community
affairs during the 1940s and 1950s and had used these connections to
obtain important acquisitions, including the Dogan House. Francis
Wilshin had made it a point to talk with park visitors and enlist their
aid in fighting threats to the park. Annie Snyder, a park neighbor
recruited by Wilshin, remained an influential ally. Russell Berry took a
similar approach when he held discussions with the Marriott Corporation
in 1973.
The Service's handling of William Center marked an
important change from previous efforts. For the first time, the Park
Service became an active negotiator in affairs outside the park. For
Hanson, Myers, and Wilshin, contacts with the local community had the
sole purpose of adding lands to the park or protecting existing lands.
Outside developments that did not touch historically significant land
were noted but not formally opposed. During the Marriott theme park
controversy, Berry did voice some concerns in his talks with the
developer, but he purposely remained a neutral party. With William
Center, the Park Service launched a new era of partnership that engaged
the park as an active institutional player in the regional business
environment.
It is unfortunate that it took until the 1980s for
the Park Service to advocate active negotiations. In the 1970s Prince
William County officials had made clear that they intended to encourage
development up to the national park's borders, Neither the park
superintendents nor their regional supervisors contacted county
representatives or local business interests to discuss the park's
concerns at that time. Such conversations, initiated before any specific
development proposals surfaced, could have headed off damaging projects
and avoided later protracted battles. Instead, the Park Service
addressed each crisis as it appeared, without the benefit of long-range
planning or allies in the local business community.
Interpretive Improvements
During the early 1980s, Superintendent Swain oversaw
the first significant revisions in interpretation at the battlefield
park since the closing of the Mission 66 era and the 1969 retirement of
Wilshin. In early summer 1980, just before Swain's arrival, facilities
at the visitor center underwent a major rehabilitation. An expanded
lobby and new information desk were added to improve contacts with the
public, ramps made the building accessible to handicapped visitors, and
new administrative offices with refinished furniture brought much-needed
space for park employees. [2]
As part of the 1980 rehabilitation, display space for
the nonprofit Eastern National Park and Monument Association increased
threefold, allowing the Manassas battlefield park to become one of the
best sources of Civil War literature in the area. The association served
as a friends group to various national park sites on the East Coast,
using space in visitor centers to sell educational and travel materials
related to the specific parks. Sales at the bookstore, which had hovered
around $30,000, jumped more than 10 per cent in 1981 and rose steadily
thereafter, amounting to more than $120,000 in 1985. According to the
contract between the association and the NPS, receipts went to Eastern
and then were distributed to the individual participating parks through
a competitive grant process. Later, Eastern adopted a method that gave a
standard 5 percent of gross sales to the participating park and 1
percent of sales to the regional office for discretionary use. As
Manassas was the only park in the National Capital Region with an
Eastern agency, Swain convinced the region to forward its percentage
automatically to the battlefield park. This 6 percent of sales augmented
the park's interpretation budget. [3]
Aside from the money it provided, Swain considered
the expanded Eastern sales area in the visitor center an important part
of the park's interpretive program. Each piece of quality information
carried away by visitors extended their stay, allowing them to "interact
with the resource, with the story of Manassas, days later, weeks later,
months later." This "portable interpretation" elaborated on the Civil
War battles and kept people in touch with the past. To aid in this
effort, Swain avoided "rubber tomahawk" items and instead focused on
book reprints, histories, and other educational materials. [4]
The improvements to the visitor center helped offset
the understaffing of the park's interpretive program in 1980. For five
months after the departure of R. Brien Varnado and before the arrival of
Swain, chief historian Stuart Vogt assumed the duties of acting
superintendent. Two park technicians left before the start of the
traditionally busy summer season, leaving the interpretive program
further shorthanded. Supervisory park technician David Ruth, who became
the acting chief historian, and seasonal Michael Andrus, who coordinated
the Volunteers-in-the-Park program and later became a full-time
employee, made up the difference admirably, presenting guided tours,
living history demonstrations, and Stone House self-directed tours.
Further assistance came from James Burgess, who joined the interpretive
staff later in the year. [5]
More enhancements to park interpretation followed. In
1982, prompted by the belief that the existing audiovisual program was
the "worst interpretive film in the Park Service," the Sons of
Confederate Veterans donated $7,000 to the park for a new one. Members
of the Confederate organization pointed out to NPS Director Russell E.
Dickenson that the old slide program, developed at the end of Wilshin's
superintendency, failed to relate the significant events of the two
Manassas battles, particularly Second Manassas, and instead gave a
general overview of the entire Civil War. They also argued that the
multiple causes for the Civil War needed explanation, not just the issue
of slavery. [6]
The Park Service's Harpers Ferry exhibit planning
center began designing a new audiovisual program, based on input from
park and agency historians. Although recognizing the inadequacies of the
former program in conveying specifics about the two Manassas battles,
Swain stressed that he wanted a ten-to-twelve-minute show that appealed
more to the general public than to the Civil War buff, who represented a
small portion of the overall visitation at the park. Edwin C. Bearss, a
well-known Civil War authority and then NPS chief historian, emphasized
the need for augmenting the discussion on Second Manassas, especially
making clear that this battle became a high-water mark for the South.
[7]
The new slide program opened in the park's auditorium
in time for the annual national camp of the Sons of Confederate Veterans
in mid-August 1983. Reconstructing the narrative from diary entries, the
show revolved around a Confederate soldier from the Stonewall Brigade
and a Union soldier from the Iron Brigade who had fought at both First
and Second Manassas. Period photographs, engravings, and Civil War music
set the tone for the presentation. Visitors now had the opportunity to
learn about the experiences of the men who had fought at Manassas. [8]
Another correction to the park's interpretive program
came in 1985 when temporary historian John Hennessy completed sixteen
Second Manassas troop movement maps, accompanied by 380 pages of
supporting text. As Bearss later recalled, these maps should have been
completed during the 1956-66 Mission 66 parks improvement program, but
Wilshin had failed to recognize their usefulness as management and
interpretive tools and did not pursue them. Hennessy's maps assisted
Swain and the park historians in recognizing the significance of certain
tracts of land and in enhancing Second Manassas interpretation. Some
battle lines that had been "fogged in conjecture" were now clarified
with solid documentation.[9]
Hennessy displayed his avid interest in Second
Manassas and his thorough understanding of historical scholarship in his
work on the troop movement maps. Swain had hired him as a temporary
employee in 1980, and although Swain tried to obtain funding for
upgrading the position to full time, Hennessy completed the maps as a
temporary park historian. Swain later characterized the arrangement as
outright exploitation because temporary employees did not receive full
benefits. Swain did convince the Eastern National Park and Monument
Association to fund a portion of Hennessy's travel research, which
enabled him to conduct background research across the country. With this
information in hand, he drew mockups of the maps, which the Denver
Service Center then refined and prepared for publication through the
Eastern park cooperating association. Bearss called the complete
380-page study a "model of its kind," representing "exceptionally high
quality." [10]
Swain also encourage wayside exhibits. These
trailside markers, positioned at key stops in the First and Second
Manassas walking and auto tours, gave visitors information on the
significance of a specific site to the two battles. Using the revised
audiovisual program as a model, Woody Harrell, the chief park historian
who had replaced Vogt in 1982, promoted the concept of letting "voices
from the past . . . speak to the visitor today." As the waysides
evolved, they included quotations from soldiers, troop position maps,
photographic reproductions, and supporting text. The new exhibit
markers, which were not installed until after Swain left in 1988,
replaced what had been a hodge-podge of markers installed over the
previous thirty years. [11]
More interpretive changes came in 1985 when Edmund
Raus transferred from the Fredericksburg and Spotsylvania County
Battlefields Memorial National Military Park to Manassas to take over
Harrell's position of chief historian. With funding from Eastern
National Park and Monument Association, Raus initiated bus tours of
Second Manassas during summer 1986. This was so successful that it was
repeated in subsequent years. Raus broadened the focus of the Stone
House exhibits, which had centered on the building as a field hospital,
to show the impact of the battles on civilians living on or near the
battlefield. He also introduced special outreach programs to enhance the
park's image in the community. He organized Saturday lectures and films
in the visitor center auditorium, an annual Christmas open house, and
five-mile guided hikes through the battlefield each spring and fall.
With a $25,000 grant, Raus initiated a new park education program
designed to meet state school curriculum standards and the needs of
Prince William County school teachers. To encourage older children to
learn about Civil War history, the park renewed its student intern
program. [12]
Raus also helped organize the park's observances of
the 125th anniversaries of the First and Second Battles of Manassas in
1986 and 1987. In keeping with the policy that NPS Director Conrad Wirth
had established after the 1961 First Manassas Reenactment, the
battlefield park hosted only special artillery firing demonstrations,
leaving the large-scale reenactments to private organizations on
non-national park lands. Civil War music programs and guided Second
Manassas tours by Hennessy, who had since left the park, gave visitors
an opportunity to learn about the battles and the time period. Many
people from the local community returned several times to participate in
the commemorative activities. [13]
William Penn Mott Jr., who followed Dickenson as NPS
director in 1985, used the opportunity of the First Manassas anniversary
gathering to address a modern-day threat to the integrity of historic
sites. He noted that interstate highways, high-rise complexes, housing
subdivisions, and other developments threatened to encircle protected
national park areas. For a place like the Manassas battlefield, Mott
warned that such intrusions could "destroy the historical atmosphere of
the parks just as surely as adverse development within their
boundaries." Scenic buffers and land acquisition were some avenues the
National Park Service could pursue to protect national parks, but the
example of the 1980 boundary expansion at Manassas demonstrated the high
cost and protracted amount of time needed. [14]
Mott recognized that each national park site relied
on the zoning and building permit system established and enforced by
local jurisdictions for the effective control of the surrounding land.
In an effort to build bridges with these officials and their voting
publics, Mott invited his listeners to join in partnership with the Park
Service to serve the needs of both the local community and the national
parks. He defended this arrangement by pointing to the benefits of
having a place like the Manassas battlefield park in Prince William
County. Tourist spending helped the local economy while residents could
enjoy the attractive open space maintained by the federal government.
The national park also enhanced the quality of life in the county by
attracting new industry and employers to the area. By considering the
relationship as a partnership in which everyone benefited, Mott hoped to
address development threats in a nonconfrontational manner. His olive
branch offering was ignored by Prince William County officials but
accepted by the William Center developer, Hazel/Peterson Companies. [15]
Planned Mixed-Use Development
Director Mott's call for partnerships between the
local community and the National Park Service faced its first test in
1986 when Prince William County representatives reviewed a new zoning
category, at Hazel/Peterson Companies' request, called a planned
mixed-use district (PMD). This category, which would "encourage and
accommodate a mix of commercial, office and residential development,"
represented a changing trend in real estate development. Pioneered in
Houston by developer Gerald D. Hines, planned mixed use linked a range
of commercial and business enterprises together in an integrated space
that economically offset the high cost of the land. The Houston Galleria
joined for the first time a retail mall, a hotel, and an office tower,
all interconnected and serviced by multilevel parking garages that
allowed consumers to park once and walk to their different destinations
within the larger complex. [16]
Hazel/Peterson, along with other developers
nationwide, adopted this plan for suburban development and added a
residential component, giving people the opportunity to live close to
where they worked and shopped. This mix became a powerful draw for
corporations, which were always seeking the best and brightest employees
they could afford. People liked the idea of working in a setting that
was close to home with nearby shopping alternatives, and businesses
responded in growing numbers by moving to planned mixed-use areas, with
the Hazel/Peterson Fair Lakes development in Fairfax County, Virginia,
being one notable example. [17]
Fair Lakes is a complex combination of imposing
development and park-like settings. Its 657 acres contain more than 5
million square feet of office retail, and hotel space, an amount
comparable to the city of Dayton, Ohio. Winding roads pass walking paths
and ponds where Hazel/Peterson encouraged waterfowl to nest. Plenty of
trees and shrubbery soften the contours further, making Fair Lakes seem
more like a park than the economically driven business community it is.
Small shopping centers are located within the development, and a
full-scale regional mall called Fair Oaks sits only five miles down the
road. Houses complete the mix. According to Milt Peterson, who had
joined forces with John T. ("Til") Hazel in 1970 to create what would
become one of the largest real estate development companies in northern
Virginia, Fair Lakes residents and workers have the sense of living and
working in the country, a pleasing alternative to commuting from
suburban subdivisions to crowded downtown office buildings. [18]
Hazel/Peterson wanted to build the same type of
mixed-use development in Prince William County on the old Marriott
tract. Although this tract had A-1 agricultural zoning, the county had
designated the site for corporate park development in its 1982
comprehensive plan. Superintendent Swain opposed this designation during
the public review process, asking for more specific information on the
type of development that might be approved, such as height restrictions
and level of density. Prince William representatives left these
questions unanswered until a definite proposal was made. [19]
Two development plans were presented during the first
half of the 1980s, both of which were warmly received by the county.
First, the state of Virginia considered building the Center for
Innovative Technology in Prince William County, and the county convinced
Marriott, still the landowner, to offer 150 acres toward a package bid.
The state instead chose a site along the Dulles Toll Road. Then in 1985,
Centennial Development Corporation purchased the entire tract from
Marriott and announced its plans to build a high-technology office park.
In December of that year, however, Centennial backed out, citing high
investment costs. Exact descriptions of these development projects were
never completed, leaving Swain with the uncomfortable belief that the
county would support almost any type of corporate park development next
to the battlefield park. His fears were confirmed in spring 1986 when
the Hazel/Peterson Companies obtained an option on the same land and
pursued its vision of building a Fair Lakes-type community in Prince
William County. [20]
Before Hazel/Peterson could begin developing the
land, the planned mixed-use district zoninga category that did not
exist in Prince William Countyhad to be approved. Although eager
to have the planned office park, the board of county supervisors had
less interest in the residential component, which demanded more
government-funded services and produced less net tax revenues than
commercial developments. Fearing that Hazel/Peterson would otherwise
abandon the site, the supervisors finally acquiesced and approved the
PMD zoning in April 1986. Having the complete development was more
important to the supervisors than losing everything over one of its
components. Their fears were well-grounded. A month later Hazel argued
that it was "totally absurd" for his company to build the office park
without the further incentives a residential-retail area would provide.
[21]
With the required zoning in place, Hazel/Peterson
announced in May what it envisioned for William Center, the 542-acre
development that would sit next to the Manassas National Battlefield
Park. Modeled after Fair Lakes, William Center would include an office
park of about 275 acres; a residential neighborhood consisting of 975
townhouses, garden apartments, and single-family homes; and a small
shopping center. Hazel expected the project to take ten years to build,
and although he would not set a figure on its value, development
officials estimated its cost as exceeding $100 million. Hazel did boast
that William Center would be a "catalytic agent" for a commercial boom
in Prince William County, blazing the way for expanded economic
development along the I-66 corridor. [22]
Negotiations With Hazel/Peterson
When Swain saw the newspaper headlines announcing the
William Center proposal, he considered his options. He knew that because
the county had approved mixed-use district zoning at the request of
Hazel/Peterson, it would view favorably the company's specific proposal
for William Center. Making any opposing statements during the public
review process seemed fruitless. Swain based this judgment on his past
experiences at county public hearings: developers had unlimited time in
which to present their proposals at zoning hearings, but Swain had a
three-minute time limit to make his case. After three minutes, the
county representatives would cut him off. [23]
It had become Swain's custom to pack as much
information as possible on the visual impact of new buildings along the
park's periphery into these three-minute presentations. He felt the
Manassas National Battlefield Park had the potential to be
"self-buffering" because its rounded shape allowed visitors the
opportunity to escape the heavy development in northern Virginia and
step back into a nineteenth-century countryside. Tall buildings along
the boundaries would disrupt this historic presence, constantly
reminding people of the present. During the zoning hearing over the
proposal to build a ten-story Holiday Inn near the park's southern
entrance, Swain showed its potential visual intrusion by running helium
balloons at the proposed height of the building and then photographing
the balloons from different places in the park. By restricting the
height of the Holiday Inn and using trees to hide the building, Swain
argued that the development would not interfere with the historic
preservation mission of battlefield park. [24]
In an ideal world, Swain would have liked no new
buildings near the park, but he understood the county's need to
diversify its tax base. By asking for height restrictions, he offered
what he thought was a compromise. But the county ignored Swain's pleas
and in November 1985 amended the regulations for its commercial zoning
category to increase the height restriction from forty-five to seventy
feet. As Swain wrote in his weekly report at the time, "it appears that
Prince William County is going out of its way to accommodate the wishes
of developers." [25]
In view of the county's history toward developers and
the park, Swain gained permission from the regional director to contact
the Hazel/Peterson Companies directly to discuss park concerns over the
William Center proposal. Swain began these negotiations in June 1986,
one month before Director Mott's speech encouraging active partnerships
between the Park Service and local jurisdictions. These negotiations
also came before Hazel/Peterson presented its proposal to the Prince
William Board of County Supervisors for review and approval. Swain found
the developer a willing listener and negotiator. As Til Hazel later
stated, "it wasn't our intention to be hostile to the Park Service....
[It was] simply a good faith effort" to keep an interested neighbor
informed. Hazel had obtained the option on the Marriott tract with some
trepidation, knowing that the Park Service had once considered acquiring
the tract. He had reviewed the 1980 Senate hearings over the boundary
expansion and felt assured that the Service no longer had an interest in
obtaining the land. Sen. Dale Bumpers, who headed the Interior
subcommittee that approved the 1980 legislation, later agreed with
Hazel's characterization, saying that the 1980 park expansion was
supposed to be the final one. Hazel, wanting to avoid contests with the
park or park advocates, welcomed the opportunity to talk with the park
superintendent. [26]
These discussions between Hazel/Peterson and Swain
resulted in the developer adopting several proffers that largely
addressed the Park Service's major concerns about William Center. One
series of proffers dealt with the visual impact of the development on
the battlefield park. First, Swain asked for and obtained an extended
buffer zone along Lee Highway, including plantings, berms, or other
suitable methods to screen the development from view, thereby protecting
the park's Brawner Farm tract from being overwhelmed by its neighbor
across the street. Unfortunately, Hazel/Peterson planned to use
deciduous trees as a screen, which would fail to hide the development
during the winter. Second, Hazel/Peterson agreed to limit the height of
all buildings to forty-five feet. Although the planned mixed-use
district zoning (which was separate from the commercial zoning category)
already contained this restriction, special use permits could be granted
by the county for a particular development. Swain convinced
Hazel/Peterson of the importance of staying within the forty-five-foot
limit for the sake of reducing the visual impact on the park. [27]
Four additional proffers related directly to traffic
concerns. First, Hazel/Peterson agreed to provide $2,250,000 toward the
design and construction of an interchange at Interstate 66 and the
proposed William Center Boulevard, the main artery for the development.
This interchange would relieve traffic on Lee Highway through the
battlefield park and provide easy access for residential and commercial
residents of William Center. Swain expected this interchange to become
part of the larger Route 234 bypass that the county had proposed
building. Hazel/Peterson also agreed to direct William Center Boulevard
traffic south onto Groveton Road, an existing road that separated the
proposed William Center from the battlefield park. This arrangement
would prevent overloading the Route 234Lee Highway intersection.
Another nod toward traffic concerns included eliminating Lee Highway
access to the community shopping center, meant to decrease use of this
already heavily traveled road. Finally, the developer agreed to
construct storm water retention ponds to limit drainage to the
predevelopment rate. This action would prevent frequent flooding of the
Lee HighwayRoute 234 intersection, where the Stone House stood.
[28]
Hazel/Peterson addressed other concerns raised by
local residents with additional proffers. The Northwest Prince William
Citizens Association (NWPWCA), of which Annie Snyder was a member,
persuaded Hazel/Peterson to decrease the number of residential units in
the William Center development from 975 dwellings to 560, thereby
reducing the county's burden to provide adequate schools and other
services for these new residents. To further assist the county, the
developer agreed to contribute $50,000 toward public school site
acquisition and construction and another $100,000 for public school
purposes. Hazel/Peterson included a community trail system to facilitate
pedestrian movements throughout the development. Recreational facilities
proffered by the developer included a community swimming pool and
center, two tennis courts, two multipurpose courts, and a multipurpose
ball field. Five acres were dedicated for a fire station and a commuter
parking lot. With these concessions in hand and knowing that they had
made the best of a bad situation, the NWPWCA spoke in favor of the
William Center rezoning. [29]
Tough Decision
Satisfied that he got "the best deal he could," Swain
spoke at the county hearing in support of rezoning the William Center
tract from agricultural to planned mixed use. As Swain expected, the
board of county supervisors voted six to one in favor of the application
(the local representative voted against the rezoning), making the
rezoning and the attached proffers legally binding. Swain did not want
the William Center development next to the park, but he knew that his
negotiations with Hazel/Peterson, along with those by the NWPWCA,
resulted in a proposal that would have much less impact than other
possible developments. He had toured the Fair Lakes development with one
of Hazel/Peterson's landscape architects and felt that the same kind of
"campus like office park" could be done at Manassas without being
overwhelmingly intrusive. Swain also knew that the county could not have
negotiated the same types of concessions with Hazel/Peterson that he
obtained. According to Virginia state law, Prince William County could
accept proffers, but it could not demand them as a condition for
approving a development. [30]
Swain made a tough decision to enter into
negotiations with Hazel/Peterson Companies, and many members of the
preservation community attacked him for appearing to favor development
over the battlefield park's integrity. Jerry Russell, national chairman
for the Civil War Round Table Associates, advocated in his
organization's monthly newsletter Swain's reassignment to another park
where he would "not need to be sensitive to history, or be a strong
representative of NPS." Russell's call prompted many of his readers, all
Civil War enthusiasts, to write the National Park Service or their
congressional representatives demanding explanations for Swain's action.
Other preservationists argued that if Swain had resolutely stood for
protection of the battlefield park, the Prince William Board of County
Supervisors would have taken his stance into account when determining
the fate of the old Marriott tract. Preservationists believed that the
Park Service managers should aggressively defend park sites from outside
assaults. Talking with developers and local landowners was acceptable,
especially because so many parks were becoming islands in a sea of
development, but preservation of park resources should remain paramount.
[31]
National Park Service representatives defended
Swain's negotiations with Hazel/Peterson Companies. Susan Moore, who
came to the Manassas National Battlefield Park in the fall of 1985 as a
management assistant and had worked closely with Swain on land-use and
land protection issues, including the William Center development, later
argued that the Park Service had to talk with developers and county
planners to protect the park. Moore stated that unfortunately "it looked
like we were in cahoots with the developer," which she insists was never
the case. Chief Historian Bearss also defended Swain to Russell and
other Civil War enthusiasts, pointing out that Swain had "stuck his neck
out" for the Service and had negotiated an honest deal that was in the
park's best interests. Bearss considered Swain a "first-class manager"
who discharged his responsibilities at the Manassas battlefield in a
"conscientious and satisfactory manner." National Capital Regional
Director Jack Fish and NPS Director Mott echoed these statements in
support of Swain. For Mott, Swain had implemented the very call for
partnerships that he had proposed. [32]
Swain may have appeared less committed to
preservation because of his quiet manner in handling issues. Bearss
characterized him as low key: "He doesn't lose his temper. He is viewed
as somebody that can talk reasonably with both sides." Moore stressed
Swain's nonconfrontational nature, his "voice of reason" in which he
thought things through very carefully and then acted in the way he felt
best preserved the park's resources. And Moore perceptively pointed out
that this was new territory for the Park Service: the agency had not
been an active negotiator with developers in then past. To Bearss and
Moore, Swain's personality and management style were assets when
addressing Hazel/Peterson's proposal. To Russell and other
preservationists, though, Swain appeared more like an "automaton
bureaucrat" who "rolled over and didn't do anything." [33]
Swain had also generated some bad press in spring
1986. When the park had acquired land to the east of the Stone Bridge,
as allowed under the 1980 boundary expansion legislation, the NPS had to
remove an old gas station. Swain brought in contractors to demolish the
building and remove the debris. To save money, Swain agreed to let the
contractors place the waste on the northern slope of Henry Hill as
opposed to hauling it to the county dump. Swain chose the side of Henry
Hill because his maintenance chief had complained that ground
depressions there had made the hill difficult to mow. The debris and
added top soil would have helped fill in the depressions. The local
newspaper reported the event and included a photograph showing the
"battlefield eyesore" within sight of the Stone House. In response to
public pressure, Swain had the debris moved, but his decisions raised
doubts about his commitment to historic preservation. [34]
Despite his poor judgment on the gas station debris,
Swain's actions following the William Center rezoning demonstrate his
continued commitment to preserve the historical integrity of the
Manassas battlefield park. Just days after the rezoning approval, Swain
wrote Regional Director Fish and requested immediate assistance in
reidentifying the exact park boundaries around the Stone House
intersection. Swain needed this information to show that the state did
not have sufficient right of way to add left and right turn lanes to the
intersection, an idea pushed by the local county supervisor. Swain
feared that adding turn lanes would ultimately result in the widening of
Lee Highway and Route 234 through the park, an idea that the county and
state came to support in 1987. The park's historic flavor would be lost
in the noise and pollution of thousands of commuters traveling the
high-speed multilane roads through the park. The fact that the county
had failed to support funding for the William Center interchange at
I-66, thereby making Lee Highway a major access road to the new
development, added extra urgency to Swain's request for help. [35]
Swain's strategy worked. Years before, the county had
straightened out a dogleg on Route 234 just south of the intersection
and in the process had placed the current 234 shoulder on park land
under a special use permit. The county then deeded to the park the land
vacated by the straightening. Once it became clear in 1987 that Prince
William County and Virginia wanted to improve the Lee HighwayRoute
234 intersection by widening both roads, Swain called them on then
special use permit. He warned that the Park Service would not give a
permit to expand the road and that the Service would not renew the
special use permit, which was due to expire in 1989. This meant that the
county could widen only three of the four arms of the intersection,
making the entire endeavor unprofitable. Talk of upgrading Lee
HighwayRoute 234 quieted, keeping the historic crossroad intact.
Yet the quiet around the Manassas National Battlefield Park was only
temporary: in 1988 the Hazel/Peterson Companies dropped a bombshell. [36]
|